• Title of article

    Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

  • Author/Authors

    Singa Wang Chiu، نويسنده , , Shan-Ling Wang، نويسنده , , Yuan-Shyi Peter Chiu، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2007
  • Pages
    13
  • From page
    664
  • To page
    676
  • Keywords
    Machine breakdown , Production run time , Defective rate , inventory , Rework
  • Journal title
    European Journal of Operational Research
  • Serial Year
    2007
  • Journal title
    European Journal of Operational Research
  • Record number

    216810