Title of article :
The CMS Preshower construction and commissioning
Author/Authors :
Lu، نويسنده , , Rong-Shyang، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
2
From page :
103
To page :
104
Abstract :
The main physics goal of the CMS Preshower detector is to provide good γ – π 0 separation in the endcap regions. The Preshower detector, comprising nearly 4300 silicon strip sensors, was assembled and commissioned in 2008 before being installed in CMS in Spring 2009. The detector check-out shows 99.9% of channels operational with good noise performance.
Keywords :
Preshower , CMS , Silicon strip detectors
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Serial Year :
2010
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Record number :
2170541
Link To Document :
بازگشت