Title of article :
Recent improvements and present status of the Munich accelerator facility
Author/Authors :
Münzer، نويسنده , , H and Rohrer، نويسنده , , L and Carli، نويسنده , , W and Hartung، نويسنده , , P and Schnitter، نويسنده , , H and Trinks، نويسنده , , U، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1996
Pages :
4
From page :
78
To page :
81
Abstract :
The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Serial Year :
1996
Journal title :
Nuclear Instruments and Methods in Physics Research Section A
Record number :
2173986
Link To Document :
بازگشت