Title of article
Commissioning of the KEK B-factory
Author/Authors
Iijima، نويسنده , , Toru، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2000
Pages
5
From page
65
To page
69
Abstract
The commissioning of the KEK B-factory started on December 1, 1998. In this paper, results obtained by August 1999 are briefly reported. The topics include the accelerator commissioning, the energy scan and the studies of the detector background.
Keywords
CP violation , B.factory , Electron–positron collider
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Serial Year
2000
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Record number
2186269
Link To Document