Title of article
A fast kicker magnet for the PSI 600 MeV proton beam to the PSI ultra-cold neutron source
Author/Authors
Anicic، نويسنده , , D. and Daum، نويسنده , , M. and Dzieglewski، نويسنده , , G. and George، نويسنده , , D. and Horvat، نويسنده , , M. and Janser، نويسنده , , G. and Jenni، نويسنده , , F. and Jirousek، نويسنده , , I. and Kirch، نويسنده , , K. and Korhonen، نويسنده , , T. and Künzi، نويسنده , , R. and Mezger، نويسنده , , A.C. and Rohrer، نويسنده , , U. and Tanner، نويسنده , , L.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2005
Pages
12
From page
598
To page
609
Abstract
The new type of ultra-cold neutron source presently under construction at PSI requires the possibility of transporting the full high-intensity proton beam, currently 2 mA, for about 8 s every 800 s onto a spallation target located at the centre of the source. For this purpose, a fast kicker magnet with a rise time (5–95%) of 0.5 ms has been built. The required magnet and power supply have been manufactured at PSI and were installed during a shutdown. A first test of the fast beam switching process, however, for safety reasons with a reduced beam intensity of 20 μ A , was performed successfully.
Keywords
Spallation neutron sources , Fast beam pulsing , Ultra-cold neutrons
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Serial Year
2005
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Record number
2198748
Link To Document