Title of article
Electro-optical cable and power feeding system for the NEMO Phase-2 project
Author/Authors
Sedita، نويسنده , , Mario، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2006
Pages
4
From page
531
To page
534
Abstract
The “NEMO Phase-2” project consists of a new facility placed on the sea floor at 3500 m depth, 40 nautical miles southeast of the south coast of Sicily. Technical aspects of the facility under realization are presented with particular attention to the electro-optical cable, the on-shore and deep-sea power transmission system, the control system and the connection system.
Keywords
Electro-optical submarine cables , Underwater power feeding systems
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Serial Year
2006
Journal title
Nuclear Instruments and Methods in Physics Research Section A
Record number
2201930
Link To Document