• Title of article

    Commissioning of the ATLAS level1 endcap muon trigger system

  • Author/Authors

    Oda، نويسنده , , S.X.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    3
  • From page
    522
  • To page
    524
  • Abstract
    The ATLAS level1 endcap muon trigger system at the LHC selects interesting events containing muons with transverse momenta greater than 6 GeV/c from 40 MHz proton–proton collisions. This system consists of 3588 Thin Gap Chambers (TGC) and the total number of readout channels is 3.18×105. The trigger logic is based on the coincidence between 7 layers of TGC. All processes are performed using hardware within the maximum latency of 2.5 μ s for the level1 trigger. To be ready for the first beam collisions scheduled in 2009, we have succeeded in sending trigger signals of cosmic ray muons with the synchronous operation at 40 MHz and fine signal timing alignments. During the single proton beam circulation at the LHC in 2008, we have also confirmed that the timing of the endcap muon trigger for tracks of beam halo muons produced at the collimator was well aligned. We report on the status of the commissioning and results from runs with cosmic ray muons and single beams.
  • Keywords
    trigger , Muon , Thin gap chamber , The ATLAS experiment
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Serial Year
    2010
  • Journal title
    Nuclear Instruments and Methods in Physics Research Section A
  • Record number

    2207156