Title of article
Multistage stochastic programming approach for offshore oilfield infrastructure planning under production sharing agreements and endogenous uncertainties
Author/Authors
Gupta، نويسنده , , Vijay and Grossmann، نويسنده , , Ignacio E.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
18
From page
180
To page
197
Abstract
The paper presents a new optimization model and solution approach for the investment and operations planning of offshore oil and gas field infrastructure. As compared to the conventional models where either fiscal rules or uncertainty in the field parameters is considered, the proposed model is the first one in the literature that includes both of these complexities in an efficient manner. In particular, a tighter formulation for the production sharing agreements based on our recent work, and a perfect positive or negative correlation among the endogenous uncertain parameters (field size, oil deliverability, water–oil ratio and gas–oil ratio) is considered to reduce the total number of scenarios in the resulting multistage stochastic formulation. To solve the large instances of the problem, a Lagrangean decomposition approach allowing parallel solution of the scenario subproblems is implemented in the GAMS grid computing environment. Computational results on a variety of oilfield development planning examples are presented to illustrate the efficiency of the model and the proposed solution approach.
Keywords
Multistage stochastic programming , production sharing agreements , oil & , gas exploration , Lagrangean decomposition , non-anticipativity constraints , endogenous uncertainties
Journal title
Journal of Petroleum Science and Engineering
Serial Year
2014
Journal title
Journal of Petroleum Science and Engineering
Record number
2216957
Link To Document