Title of article
Age Based and Partial Preventive Replacement Policies subject to Shocks
Author/Authors
ayough، ashkan نويسنده , , Khorshidvand، Behrouz نويسنده Kar Higher education Institute, Qazvin, Iran , , Tabriz، Akbar Alem نويسنده Shahid Beheshti University, Tehran, Iran ,
Issue Information
دوماهنامه با شماره پیاپی سال 2015
Pages
8
From page
813
To page
820
Abstract
In this article, two systems subject to shocks occurring based on a non-homogeneous Poisson
process (NHPP) and failure rate are analyzed. The first system is consisted of a single unit
that partial preventive replacements (PPR) of lower indenture level components can be
done. The second system is consisted of single unit with age based replacement policy
(ABR). In PPR system, occurrence of a defeat causes system stopping and consequently
system will be received minimal repairs and following the occurrence of a shock the system
has received inspection. Also this system is replaced after time T preventively. In ABR
system a defeat leads to unit stopping and accordingly the unit has received minimal repairs
and after a shock has received inspection. This system is replaced at time T or at times less
than T preventively, due to failure of unit. The systems will be replaced with new and the
same types, so analysis done based on average cost rate. Two examples are studied and
optimal replacement age which minimizes expected cost is obtained and according to results
and comparison of models, some analyses are provided.
Journal title
Management and Administrative Sciences Review
Serial Year
2015
Journal title
Management and Administrative Sciences Review
Record number
2238723
Link To Document