Title of article :
Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown
Author/Authors :
Adressi، A. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran , , Tasouji Hassanpour ، S. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran , , Azizi ، V. نويسنده Department of Industrial Engineering, K. N. Toosi University of Technology, Iran, Tehran ,
Issue Information :
فصلنامه با شماره پیاپی 15 سال 2016
Pages :
12
From page :
157
To page :
168
Abstract :
In this paper, group scheduling problem in no-wait flexible flowshop is considered by considering two stages with group sequence-dependent setup times and random breakdown of the machines. Genetic algorithm and simulated annealing based heuristics have been proposed to solve the problem. The primary objective of scheduling is to minimize the maximum completion time of the jobs for two classes of small and large scale problems. Computational results show that both GA and SA algorithms perform properly, but SA appeared to provide better results for both small and large scale problems.
Journal title :
Decision Science Letters
Serial Year :
2016
Journal title :
Decision Science Letters
Record number :
2260172
Link To Document :
بازگشت