Title of article
A Rolling Horizon Approach to Plan Outsourcing in Manufacturing-to-Order Environments Affected by Uncertainty
Author/Authors
Tolio، نويسنده , , T. and Urgo، نويسنده , , M.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
4
From page
487
To page
490
Abstract
Production planning approaches considering availability of complete information, usually fail to deal with real manufacturing environments characterized by uncertainty affecting the time to execute the manufacturing operations, the routing of the parts, the requirement of materials and resources. This paper analyses the problem of negotiation and planning of external resource usage in a manufacturing system affected by uncertainty. In particular the need of resources is considered uncertain and it is modelled through a scenario based formulation. A rolling horizon approach is proposed which applies a two-stage stochastic programming method against the occurrence of multiple uncertain events.To demonstrate the viability of the proposed approach, an application example based on a real manufacturing plant producing machining centres is provided.
Keywords
production planning , Machining centers , uncertainty
Journal title
CIRP Annals - Manufacturing Technology
Serial Year
2007
Journal title
CIRP Annals - Manufacturing Technology
Record number
2267851
Link To Document