Title of article
Combination of planning methods in a comprehensive production planning approach for sequenced production lines
Author/Authors
Matyas، نويسنده , , Kurt and Auer، نويسنده , , Stefan، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
4
From page
445
To page
448
Abstract
Medium-term sales and operations as well as medium to short-term production planning in customer order driven production processes are performed using a cascading planning process. A lack of coordination and feedback between different planning phases causes problems with a negative effect on costs in production that originate from unfeasible production programs. Based on a system for the classification of planning restrictions the planning process will be controlled utilizing a newly developed combination of the methods of Linear Programming and Constraint Programming. The result is a formal logic to combine the different planning horizons and the two sets of planning methods.
Keywords
production planning , sequencing , Program planning
Journal title
CIRP Annals - Manufacturing Technology
Serial Year
2012
Journal title
CIRP Annals - Manufacturing Technology
Record number
2269610
Link To Document