Title of article
Effective and efficient scheduling of dynamic job shops—Combining the shifting bottleneck procedure with variable neighbourhood search
Author/Authors
Scholz-Reiter، نويسنده , , Bernd and Hildebrandt، نويسنده , , Torsten and Tan، نويسنده , , Yi، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
4
From page
423
To page
426
Abstract
Minimizing total weighted tardiness for job shops is a hard production scheduling problem. Shifting bottleneck (SB) procedures, which use a backtracking technique, can achieve excellent results for this problem. However, they usually require long computation times and do not scale well to larger problem instances of a realistic industrial size. In order to enhance the efficiency of SB procedures, we use variable neighbourhood search (VNS) instead of backtracking to optimize the machine planning sequence and the decomposed single machine problems. Evaluation on static benchmark problem instances and more realistic, dynamic scenarios confirms the performance and efficiency of our SB-VNS procedure.
Keywords
Scheduling , shifting bottleneck procedure , optimization
Journal title
CIRP Annals - Manufacturing Technology
Serial Year
2013
Journal title
CIRP Annals - Manufacturing Technology
Record number
2269904
Link To Document