• Title of article

    A safety assessment of the new Xiangyun phosphogypsum tailings pond

  • Author/Authors

    Wang، نويسنده , , T. and Zhou، نويسنده , , Y. and Lv، نويسنده , , Q. and Zhu، نويسنده , , Yuanle and Jiang، نويسنده , , C.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    7
  • From page
    1084
  • To page
    1090
  • Abstract
    Phosphogypsum tailings are piled up to form a phosphogypsum tailings pond. In the design and operation stages of a tailings project, the stability of the tailings pond, the control capacity for flood, and the reliability of the drainage and safety monitoring facilities should be fully evaluated. Key contents of the safety assessment are analyzed in view of the new Xiangyun phosphogypsum tailings pond, which is currently in the design stage. Flood routing calculation results show that the pond cannot meet the requirements of the China National Standards Safety Code in the condition of a 500-year flood even if the drainage facilities operate normally. Seepage and static stability of the tailings pond are investigated through numerical and limit equilibrium methods. The results indicate that the sliding stability can meet the requirements along the starter dike profile. Dynamic calculation results show that the liquefied area is at the top of the dam slope and it cannot influence the dam safety. The aspects of safety monitoring design that require attention are also proposed.
  • Keywords
    Phosphogypsum , Tailings Pond , Safety assessment
  • Journal title
    Minerals Engineering
  • Serial Year
    2011
  • Journal title
    Minerals Engineering
  • Record number

    2276190