Title of article :
Investigation of the effect of mineralogy as rate-limiting factors in large particle leaching
Author/Authors :
Ghorbani، نويسنده , , Yousef and Becker، نويسنده , , Megan and Petersen، نويسنده , , Jochen and Mainza، نويسنده , , Aubrey N. and Franzidis، نويسنده , , Jean-Paul، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Pages :
14
From page :
38
To page :
51
Abstract :
Although heap leaching is by now well established in the mining industry, the process remains limited by low recoveries with different rate-limiting factors that are not clearly understood. In this study, three large particle size classes (+19/−25, +9.5/−16, +4.75/−5 mm) were prepared from a sphalerite ore by two different methods of comminution (HPGR and cone crusher). The particles were then packed into leach reactors that were operated continuously for 11 months with well-mixed internal circulation of the leach solution. Characterization of the residue of the leach reactors indicated that there are areas within the ore particles where although sphalerite grains are accessible to the solution, they remain unreacted. X-ray tomography and QEMSCAN® analysis of the selected samples before, during and after leaching, showed increased leaching of sphalerite grains associated with pyrite due to galvanic interactions. Mineral chemistry (Fe, Mn content of sphalerite) and jarosite precipitation were also investigated as factors influencing sphalerite leaching.
Keywords :
Sphalerite , heap leaching , X-ray tomography , Mineral composition , Mineral association
Journal title :
Minerals Engineering
Serial Year :
2013
Journal title :
Minerals Engineering
Record number :
2277119
Link To Document :
بازگشت