Title of article
Research on the Performance Evaluation of Integrated Project Management Based on PBS
Author/Authors
Yanwei، نويسنده , , Wang and Songjiang، نويسنده , , Wang and Yi، نويسنده , , Huang and Wei، نويسنده , , Wang، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
5
From page
249
To page
253
Abstract
On the basis of Hallʹs three-dimensional model system, and according to project management practices, the paper sets up the integrated model of project management based on the PBS, and the integrated model includes three dimensionalities, i.e. elements integrated, process integrated and stakeholders integrated. In order to test the model, the paper established the integrated project management evaluation model according to general evaluation principles and system reconstruction theories. Utilizing the integrated method, the model divided the performance of project management into three dimensionalities that is time, space, and benefit, and achieved the combination of qualitative and quantitative performance evaluation of integrated project management.
Keywords
Integrated management , Project Breakdown Structure(PBS) Meta-synthesis Method , Meta-synthesis performance evaluation , Wukun Freeway , Project Management
Journal title
Procedia Earth and Planetary Science
Serial Year
2012
Journal title
Procedia Earth and Planetary Science
Record number
2320102
Link To Document