• Title of article

    Studies on Surrounding Soil during Construction using the Deep Pipe Jacking Method in the Deep Strata

  • Author/Authors

    Senda، نويسنده , , Takashi and Maeda، نويسنده , , Yasutaka and Shimada، نويسنده , , Hideki and Sasaoka، نويسنده , , Takashi and Matsui، نويسنده , , Kikuo، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    7
  • From page
    396
  • To page
    402
  • Abstract
    In Japan when urban infrastructures need to be constructed, the difficulty of utilizing t he ground or shallow strata will necessarily lead to the more frequent use of the deep strata. The common construction methods are open-cut, pipe jacking, and shield methods.In recent years a new pipe jacking method has been established that can be adap ted to 20 m below the ground or more. Using the method, the drivage machine and the jacking pipe continue to move an underground until the completion of the driving. Therefore an over-cutting area (so-called tail-void) must be formed to lower the friction between the ground and the pipe. The tail-void is filled with lubrications. However, because the stress release of the ground continues to advance when the tail -void is formed, there are some challenges required to cope with the stability of the surroundin g ground. In order to utilize the pipe jacking method in the deeper strata layers, the theory, analysis and installation of tail -void have to be systemized, and such systematic data must be stored. Therefore, the conditions of tail-void in the deep pipe jacking method are discussed using numerical analyses.
  • Keywords
    Tail-void , deep strata , Pipe jacking system
  • Journal title
    Procedia Earth and Planetary Science
  • Serial Year
    2013
  • Journal title
    Procedia Earth and Planetary Science
  • Record number

    2320263