Title of article
Integrating generation and transmission networks reliability for unit commitment solution
Author/Authors
Jalilzadeh، نويسنده , , S. and Shayeghi، نويسنده , , H. and Hadadian، نويسنده , , H.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2009
Pages
9
From page
777
To page
785
Abstract
This paper presents a new method with integration of generation and transmission networks reliability for the solution of unit commitment (UC) problem. In fact, in order to have a more accurate assessment of system reserve requirement, in addition to unavailability of generation units, unavailability of transmission lines are also taken into account. In this way, evaluation of the required spinning reserve (SR) capacity is performed by applying reliability constraints based on loss of load probability and expected energy not supplied (EENS) indices. Calculation of the above parameters is accomplished by employing a novel procedure based on the linear programming which it also minimizes them to achieve optimum level of the SR capacity and consequently a cost-benefit reliability constrained UC schedule. In addition, a powerful solution technique called “integer-coded genetic algorithm (ICGA)” is being used for the solution of the proposed method. Numerical results on the IEEE reliability test system show that the consideration of transmission network unavailability has an important influence on reliability indices of the UC schedules.
Keywords
Reliability constraints , Transmission network , Unit Commitment , Integer-coded genetic algorithm
Journal title
Energy Conversion and Management
Serial Year
2009
Journal title
Energy Conversion and Management
Record number
2334561
Link To Document