Title of article
Analysis of critical field procedures for power HV overhead transmission line splices installed after restructuring of Brazilian electrical sector
Author/Authors
Barbosa، نويسنده , , C. and Francato، نويسنده , , A. and Mariotoni، نويسنده , , C. and Ferreira، نويسنده , , I. and Mascia، نويسنده , , N. and Barbosa، نويسنده , , P.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
6
From page
1842
To page
1847
Abstract
The electricity transmission system lines in the Brazilian re-structured market is the subject on this work. Also are studied transmission lines field procedures considering economy and reliability of ACSR (Aluminum Core Steel Reinforced) cables and compression splices. The work describes compression splices field surveys with suppliers and users concessionaires and also suggest some procedures and inspections routines to improve system reliability.
Keywords
FEM , Splices , Quality , Overhead transmission lines , Reliability
Journal title
Engineering Failure Analysis
Serial Year
2011
Journal title
Engineering Failure Analysis
Record number
2339410
Link To Document