• Title of article

    Analysis of critical field procedures for power HV overhead transmission line splices installed after restructuring of Brazilian electrical sector

  • Author/Authors

    Barbosa، نويسنده , , C. and Francato، نويسنده , , A. and Mariotoni، نويسنده , , C. and Ferreira، نويسنده , , I. and Mascia، نويسنده , , N. and Barbosa، نويسنده , , P.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    6
  • From page
    1842
  • To page
    1847
  • Abstract
    The electricity transmission system lines in the Brazilian re-structured market is the subject on this work. Also are studied transmission lines field procedures considering economy and reliability of ACSR (Aluminum Core Steel Reinforced) cables and compression splices. The work describes compression splices field surveys with suppliers and users concessionaires and also suggest some procedures and inspections routines to improve system reliability.
  • Keywords
    FEM , Splices , Quality , Overhead transmission lines , Reliability
  • Journal title
    Engineering Failure Analysis
  • Serial Year
    2011
  • Journal title
    Engineering Failure Analysis
  • Record number