Title of article
Study on the ultimate depth of scour pit downstream of debris flow sabo dam based on the energy method
Author/Authors
Pan، نويسنده , , Huali and Wang، نويسنده , , Ren and Huang، نويسنده , , Jiangcheng and Ou، نويسنده , , Guoqiang، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2013
Pages
7
From page
103
To page
109
Abstract
The ultimate depth of a scour pit downstream of a debris flow sabo dam is an important design parameter in determining the foundation bearing depth of a debris flow for Sabo dam. This paper considers the scour pit system as a black box, neglecting the energy consumed by inter-particle collision of debris flow and the collision between debris flow and the valley bed. A formula was developed for the ultimate depth of a scour pit using the energy method to establish debris flow energy changes in and out of scour pit, combined with the energy needed by sediment incipient. When the results of the formula are compared with a series of indoor flume experiments, the error ranged from 3.1% to 17.6%. The calculated and experimental values agreed well, indicating that the method based on the energy method is reasonable and feasible.
Keywords
Ultimate depth , energy method , Scour pit behind debris flow sabo dam , Black box
Journal title
Engineering Geology
Serial Year
2013
Journal title
Engineering Geology
Record number
2342165
Link To Document