• Title of article

    Replacement strategy for ASDEX upgrade’s new control and data acquisition

  • Author/Authors

    Raupp، نويسنده , , G and Behler، نويسنده , , K and Cole، نويسنده , , R and Engelhardt، نويسنده , , Geoffrey M. and Lohs، نويسنده , , A and Lüddecke، نويسنده , , K and Neu، نويسنده , , G and Treutterer، نويسنده , , W and Vijverberg، نويسنده , , Th and Zasche، نويسنده , , D and Zehetbauer، نويسنده , , Th، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2004
  • Pages
    5
  • From page
    41
  • To page
    45
  • Abstract
    ASDEX Upgrade is being equipped with a new real-time plasma control and data acquisition system and a novel time system. Major components were implemented and installed. While much work for performance optimisation and application programming remains to be done, commissioning of the new system parallel to experiment operation is being prepared. Commissioning of the new system will be done step-by-step. To facilitate testing the old and new control systems share all input signals. Switching between old and new system can be performed within 60 min: 23 fibre optics for output of actuator commands and input triggers must be connected to the active system and minor modifications done to interface the machine protection. Commissioning phases include background listening, technical discharges and full plasma operation. With the strategy chosen we minimize risk to the machine and reduce interference with ongoing experiment campaigns.
  • Keywords
    tokamak , CONTROL SYSTEM , DATA ACQUISITION
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2004
  • Journal title
    Fusion Engineering and Design
  • Record number

    2351750