Bruschi، نويسنده , , A. and Cirant، نويسنده , , S. and Gandini، نويسنده , , F. and Gittini، نويسنده , , G. and Granucci، نويسنده , , G. and Mellera، نويسنده , , V. and Muzzini، نويسنده , , V. and Nardone، نويسنده , , A. and Simonetto، نويسنده , , A. and Sozzi، نويسنده , , C. and Spinicchia، نويسنده , , N. and Angella، نويسنده , , G. and Signorelli، نويسنده , , E.، نويسنده ,
Abstract :
An increased power handling of rf-beam loads is required by the development of high power gyrotrons for fusion research, as well as the achievement of full capability to work under vacuum conditions, which is imposed by the use of evacuated transmission lines. New techniques were developed at IFP/CNR, leading to two prototypes. One is capable of 1 MW CW operation, while the second one is designed for precise measurements at short-pulses (0.1 s) at higher peak power (2 MW).
inary tests at 140 GHz, high power and long pulse (500 kW, 10 s) were performed.
Keywords :