Title of article :
The ASDEX Upgrade discharge schedule
Author/Authors :
Neu، نويسنده , , Maurice G. and Engelhardt، نويسنده , , K. and Raupp، نويسنده , , G. and Treutterer، نويسنده , , W. and Zasche، نويسنده , , D. and Zehetbauer، نويسنده , , T.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2007
Pages :
6
From page :
1111
To page :
1116
Abstract :
ASDEX Upgradeʹs recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible “data driven” one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. ta is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. ntral input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. g, generation and validation tools, and version control through CVS allow for efficient management of DSs.
Keywords :
XML , segment , Discharge schedule , Discharge control
Journal title :
Fusion Engineering and Design
Serial Year :
2007
Journal title :
Fusion Engineering and Design
Record number :
2353834
Link To Document :
بازگشت