Abstract
ASDEX Upgradeʹs recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible “data driven” one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge.
ta is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas.
ntral input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions.
g, generation and validation tools, and version control through CVS allow for efficient management of DSs.
Keywords
XML , segment , Discharge schedule , Discharge control