Title of article :
Industrial engineering studies for the manufacture of the ITER PF coils
Author/Authors :
Libeyre، نويسنده , , P. and Decool، نويسنده , , P. and Guerin، نويسنده , , O. and Perrella، نويسنده , , M. and Bourquard، نويسنده , , A.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2007
Abstract :
Industrial studies have been carried out in Europe to prepare the manufacture of the five poloidal field (PF) coils, which will be manufactured on the ITER site.
t study, carried out by Ansaldo Superconduttori, addressed the manufacturing sequence, assuming the manufacture of the PF coils inside the two buildings which will further host the cryogenic system. A second study, carried out by Alstom investigated how to achieve the manufacture of some crucial points. A new layout of the manufacturing line was proposed, aiming at manufacture of the PF2–6 coils within 36 months. A recent study performed by Alstom, assumes the manufacture of the PF coils in a single dedicated building, releasing so the constraint of meeting the deadline fixed in ITER reference scheme by the starting point of installation of the cryogenic components.
Keywords :
ITER , Field , Coils , Manufacture , Poloidal
Journal title :
Fusion Engineering and Design
Journal title :
Fusion Engineering and Design