Title of article
Construction scheduling using Genetic Algorithm based on Building Information Model
Author/Authors
Faghihi، نويسنده , , Vahid and Reinschmidt، نويسنده , , Kenneth F. and Kang، نويسنده , , Julian H.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2014
Pages
14
From page
7565
To page
7578
Abstract
The construction project schedule is one of the most important tools for project managers in the Architecture, Engineering, and Construction (AEC) industry that makes them able to track and manage the time, cost, and quality (a.k.a. Project Management Triangle) of projects. Developing project schedules is almost always troublesome, since it is heavily dependent on project planners’ knowledge of work packages, on-the-job-experience, planning capability and oversight. Having a thorough understanding of the project geometries and their internal interacting stability relations plays a significant role in generating practical construction sequencing. On the other hand, the new concept of embedding all the project information into a 3-dimensional representation of a project (a.k.a. Building Information Model or BIM) has recently drawn attention to the construction industry.
s paper, the authors demonstrate a novel approach of retrieving enough information from the BIM of a project and then develop construction sequencing for the installation of the project elements. For this reason a computer application is developed that can automatically derive a structurally (statically) stable construction sequence, using the concept of the Genetic Algorithm (GA). The term “structurally stable sequencing” in this article refers to the sequencing order of erection in which the structure remains statically stable locally and globally during the entire installation process. To validate the proposed methodology, the authors designed 21 different experiments and used the proposed method for generating stable construction schedules, which all were successfully accomplished. Therefore, this methodology proposes a novel approach of construction project application of the GA, as an Expert System tool.
Keywords
Construction project schedule , Building information model , genetic algorithm , Stability relations
Journal title
Expert Systems with Applications
Serial Year
2014
Journal title
Expert Systems with Applications
Record number
2355254
Link To Document