Title of article :
Progress on the heating and current drive systems for ITER
Author/Authors :
Jacquinot، نويسنده , , J. and Albajar، نويسنده , , F. and Beaumont، نويسنده , , B. and Becoulet، نويسنده , , A. and Bonicelli، نويسنده , , T. C. Bora، نويسنده , , D. and Campbell، نويسنده , , D. R. Chakraborty، نويسنده , , A. and Darbos، نويسنده , , C. and Decamps، نويسنده , , H. and Denisov، نويسنده , , Anthony G. and Goulding، نويسنده , , R. and Graceffa، نويسنده , , J. and Gassmann، نويسنده , , T. and Hemsworth، نويسنده , , R. and Henderson، نويسنده , , M. and Hoang، نويسنده , , G.T. and Inoue، نويسنده , , T. and Kobayashi، نويسنده , , N. and Lamalle، نويسنده , , P.U. and Mukherjee، نويسنده , , Christina A. and Nightingale، نويسنده , , M. and Rasmussen، نويسنده , , D. and Rao، نويسنده , , S.L. and Saibene، نويسنده , , G. and Sakamoto، نويسنده , , K. and Sartori، نويسنده , , R. and Schunke، نويسنده , , B. and Sonato، نويسنده , , P. and Swain، نويسنده , , D. and Takahashi، نويسنده , , K. and Tanaka، نويسنده , , M. and Tanga، نويسنده , , A. and Watanabe، نويسنده , , K.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
6
From page :
125
To page :
130
Abstract :
The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.
Keywords :
tokamak , Heating and current drive , Electron cyclotron waves , Lower Hybrid Waves , Rf heating , Ion cyclotron waves , NB heating , ITER
Journal title :
Fusion Engineering and Design
Serial Year :
2009
Journal title :
Fusion Engineering and Design
Record number :
2355453
Link To Document :
بازگشت