Author/Authors :
Gassmann، نويسنده , , T. and Beaumont، نويسنده , , B. and Baruah، نويسنده , , U.K. and Bonicelli، نويسنده , , T. and Chiocchio، نويسنده , , S. and Cox، نويسنده , , D. and Darbos، نويسنده , , C. and Decamps، نويسنده , , H. and Denisov، نويسنده , , G. and Henderson، نويسنده , , M. and Kazarian، نويسنده , , F. and Lamalle، نويسنده , , P.U. and Mukherjee، نويسنده , , A. and Rasmussen، نويسنده , , D. and Saibene، نويسنده , , G. and Sartori، نويسنده , , R. and Sakamoto، نويسنده , , K. and Tanga، نويسنده , , A.، نويسنده ,
Abstract :
The RF heating and current drive (H&CD) systems that are to be installed in ITER during the construction phase, are the electron cyclotron (EC) and ion cyclotron (IC) systems. They are complex assemblies of high voltage power supplies (HVPS), RF generators, transmission lines and antennas. Their design and integration are constrained by many interfaces, both internal, between the subsystems, and external, with the other ITER systems. In addition, some components must be compatible with a nuclear environment and are classified as Safety Important Component. This paper describes the processes implemented in ITER to ensure proper integration.
Keywords :
ITER , Electron cyclotron , Integration , Ion cyclotron