Title of article :
Status of ITER procurement activities in Korea
Author/Authors :
Jung، نويسنده , , K.J. and Kwon، نويسنده , , S.P. and Lee، نويسنده , , H.G. and Bak، نويسنده , , J.S. and Lee، نويسنده , , G.S.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
5
From page :
2217
To page :
2221
Abstract :
The Republic of Korea is participating in the ITER project as a full member and procuring components for the ITER tokamak and its facility. This paper presents the current stage of preparation of the ITER components to be delivered by Korea including an overview of Korean activities related to the ITER project, as of October 2009.
Keywords :
ITER Korea (KO-DA) , ITER , Vacuum vessel , Thermal shield , Procurement arrangement , Assembly tooling
Journal title :
Fusion Engineering and Design
Serial Year :
2010
Journal title :
Fusion Engineering and Design
Record number :
2357273
Link To Document :
بازگشت