Author/Authors :
Kazarian، نويسنده , , F. and Beaumont، نويسنده , , B. and Arambhadiya، نويسنده , , B. and Gassmann، نويسنده , , T. and Lamalle، نويسنده , , Ph. and Rathi، نويسنده , , D. and Mukherjee، نويسنده , , A. and Ajesh، نويسنده , , P. and Machchhar، نويسنده , , H. and Patadia، نويسنده , , D. and Patel، نويسنده , , M. and Rajnish، نويسنده , , K. and Singh، نويسنده , , R. and Suthar، نويسنده , , G. and Trivedi، نويسنده , , R. and Kumazawa، نويسنده , , R.، نويسنده ,
Abstract :
The Ion Cyclotron Heating and Current Drive (IC H&CD) system for ITER will provide 20 MW to the plasma. The associated Radio Frequency (RF) source system has to be compliant with all operation modes foreseen in that frame. Their specifications are fully described in this paper and constraints on IC RF source components are detailed, in particular concerning the final stage tube of the amplifier. Results of tests performed under a collaborative work at the National Institute for Fusion Science (NIFS) facility are presented. Consequences on the procurement process by ITER India (II) are deduced.
Keywords :
ITER , CW operation , CD system , Tetrode , IC RF H&