• Title of article

    Impact of ITER PF coils power supplies and central solenoid design changes on plasma operation

  • Author/Authors

    Cavinato، نويسنده , , M. and Labate، نويسنده , , C.V. and Mattei، نويسنده , , M. and Parail، نويسنده , , V. and Saibene، نويسنده , , G. and Sartori، نويسنده , , R. and Sips، نويسنده , , A.C.C.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    4
  • From page
    1103
  • To page
    1106
  • Abstract
    As the ITER project moves forward in the procurement phase of major components, the baseline design is subject to a series of modifications due to the finalization of the design and interaction with industry. odifications have a potential impact on the performance and operation of the machine. A substantial activity is being carried out in EU in support to the design, aimed at assessing such impact. fect of the 2010 design of the central solenoid on the operational space was assessed. A detailed analysis of the plasma breakdown and start-up phases was performed to assess the impact of withdrawing the booster converters from the baseline design and of the modifications to the power supply voltage ratings. In order to reach a clear conclusion, a review of the start-up strategy was also carried out starting from an analysis of the avalanche and breakdown conditions in ITER. The controllability of the null quality and position was verified in presence of uncertainties and measurement errors. The advantages of higher voltage rating were also quantified. l aim of the paper is to present an overview of the analyses performed and of the issues identified providing an assessment of the impact of some of the proposed changes on ITER operation.
  • Keywords
    Plasma control , power supplies
  • Journal title
    Fusion Engineering and Design
  • Serial Year
    2011
  • Journal title
    Fusion Engineering and Design
  • Record number

    2357999