Title of article :
ITER Remote Maintenance System (IRMS) lifecycle management
Author/Authors :
Tesini، نويسنده , , Alessandro and Otto’، نويسنده , , Bede and Blight، نويسنده , , John and Choi، نويسنده , , Chang-Hwan and Friconneau، نويسنده , , Jean-Pierre and Gotewal، نويسنده , , Krishan Kumar and Hamilton، نويسنده , , David and Heckendorn، نويسنده , , Frank and Martins، نويسنده , , Jean-Pierre and Marty، نويسنده , , Thomas and Nakahira، نويسنده , , Masataka and Palmer، نويسنده , , Jim and، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Abstract :
The availability of the ITER machine to perform its scientific program is strongly dependent on the performance of the different Remote Handling (RH) systems constituting the ITER Remote Maintenance System (IRMS). The lifecycle of the IRMS will largely exceed 40 years from initial concept design and proof testing through to machine decommissioning. Such a long lifecycle requires that a rigorous approach is put in place to guarantee the technical capabilities of the highly innovative IRMS, its efficiency and its availability. For this purpose, an IRMS System Engineering and IRMS lifecycle management approach has been adopted by ITER. The approach aims at ensuring the IRMS full operability and availability at an acceptable cost of ownership over the full ITER machine assembly and operations period. The IRMS lifecycle management method described in this paper covers such subjects as specific requirements for IRMS design reviews, monitoring during manufacture, factory and site acceptance testing, integrated commissioning, decontamination, maintenance and re-qualification strategies, requirements for Integrated Logistical Support during operations. The updating and implementation of the IRMS lifecycle strategy and this procedure will be managed and monitored by the Remote Handling Integrated Product Team (RH-IPT). Although developed for the IRMS, the basic principles and procedures of lifecycle management could be applied to other ITER plant systems whose reliability and availability will be essential for the continued operation of the ITER machine.
Keywords :
ITER , ITER Remote Maintenance System , System Engineering Management Plan , Domestic Agency , ITER Organization , ITER Remote Maintenance Management System , remote handling , Remote Handling Integrated Product Team , Integrated Logistic Support
Journal title :
Fusion Engineering and Design
Journal title :
Fusion Engineering and Design