Title of article :
Effect of outside tritium source on tritium balance of a D-T fusion reactor
Author/Authors :
Nishikawa، نويسنده , , Masabumi and Yamasaki، نويسنده , , Hideki and Kashimura، نويسنده , , Hideaki and Matsuda، نويسنده , , Shohei، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
5
From page :
466
To page :
470
Abstract :
Attainable tritium breeding ration in the blanket system must be larger than the required breeding ratio when no effective tritium resources from outside are expected. It is revealed recently that a considerable amount of tritium can be trapped to the re-deposition layer of the first wall materials and that the time constant of this phenomenon is rather long. Then, the tritium breeding ratio around 1.1 is required in the blanket system when 3 years is claimed for the tritium doubling time to prepare tritium for the initial inventory of a next reactor. Construction of an outside tritium supply is one of the possible ways to compensate the lack of tritium because it is generally considered that the attainable tritium breeding ratio in the solid breeder system is around 1.05. It is reported recently that a high-temperature gas-cooled reactor can produce 10 kg of tritium per year. The preferable amount of tritium production rate of the outer tritium supply is discussed in this study from the viewpoint of tritium balance in a D-T power reactor.
Keywords :
Tritium balance , (TBR)BS required , Outer tritium supply , Co-deposition , (TBR)BS attainable
Journal title :
Fusion Engineering and Design
Serial Year :
2012
Journal title :
Fusion Engineering and Design
Record number :
2359337
Link To Document :
بازگشت