Title of article :
Manufacturing studies of double wall components for the ITER EC H&CD upper launcher
Author/Authors :
Spaeh، نويسنده , , P. and Aiello، نويسنده , , G. and Goldmann، نويسنده , , A. and Kleefeldt، نويسنده , , K. and Kroiss، نويسنده , , A. and Meier، نويسنده , , Russell A. and Obermeier، نويسنده , , C. and Scherer، نويسنده , , T. and Schreck، نويسنده , , S. and Serikov، نويسنده , , A. and Strauss، نويسنده , , D. and Vaccaro، نويسنده , , A.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
5
From page :
956
To page :
960
Abstract :
To counteract plasma instabilities, Electron Cyclotron Launchers will be installed in four of the ITER Upper Ports. The structural system of an EC Upper Launcher accommodates the MM-wave-components and has to meet strong demands on alignment, removal of nuclear heat loads, mechanical strength and nuclear shielding. The EC Upper Launcher has successfully undergone the Preliminary Design Review in 2009 and is now in the final design phase. Nuclear heat loads from 0.1 W/cm3 up to 0.8 W/cm3 will affect the front area of the launcher main frame. To guarantee save and homogenous removal of those heat loads, the front part of the launcher main frame is designed as a double wall steel-casing with cooling channels inside the shell structure. To finalize the design of this double wall component, the main emphasis is now to define the cooling channels geometry and to identify the optimum manufacturing route to assure adequate flow of coolant and sufficient mechanical strength in compliance with required dimension tolerances and quality of the welds. Several manufacturing options have been investigated and were evaluated by computational analysis and fabrication of pre-prototypes. To come to a final design, the most promising route will be chosen to manufacture a full-size mock-up of the double wall main frame. It will be tested at the KIT Launcher Handling Test facility to check the compliance with the design goals related to geometrical accuracy and thermo-hydraulic characteristics. This paper describes the design and the manufacturing routes of the prototypic double wall main frame.
Keywords :
mechanical engineering , CAD , Vacuum vessel , ITER , ECRH , Port plug