Title of article :
Design progress on ITER port plug test facility
Author/Authors :
Levesy، نويسنده , , Jason B. and Beaumont، نويسنده , , Joمo B. and Bruno، نويسنده , , L. and Cerisier، نويسنده , , T. and Cordier، نويسنده , , J.J. and Dammann، نويسنده , , A. and Giancarli، نويسنده , , L. and Henderson، نويسنده , , M. and Romannikov، نويسنده , , Sergey A. and Rumyantsev، نويسنده , , Y. and Udintsev، نويسنده , , V.S.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
5
From page :
1060
To page :
1064
Abstract :
To achieve the overall ITER machine availability target, the availability of diagnostics and heating port plugs shall be as high as 99.5%. To fulfill these requirements, it is mandatory to test the port plugs at operating temperature before installation on the machine and after refurbishment. ER port plug test facility (PPTF) provides the possibility to test upper and equatorial port plugs before installation on the machine. The port plug test facility is composed of several test stands. These test stands are first used in the domestic agencies and on the ITER Organization site to test the port plugs at the end of manufacturing. Two of these stands are installed later in the ITER hot cell facility to test the port plugs after refurbishment. The port plugs to be tested are the Ion Cyclotron (IC) heating and current drive antennas, Electron Cyclotron (EC) heating and current drive launchers, diagnostics and test blanket modules port plugs. tands shall be capable to perform environmental and functional tests. The test stands are composed of one vacuum tank (3.3 m in diameter, 5.6 m long) and the associated heating, vacuum and control systems. The vacuum tank shall achieve an ultimate pressure of 1 × 10−5 Pa at 100 °C containing a port plug. The heating system shall provide water at 240 °C and 4.4 MPa to heat up the port plugs. Openings are provided on the back of the vacuum tank to insert probes for the functional tests. aper describes the tests to be performed on the port plugs and the conceptual design of the port plug test facility. The configuration of the standalone test stands and the integration in the hot cell facility are presented.
Keywords :
ITER , Port plug , Test facility , Hot cell , MAINTENANCE
Journal title :
Fusion Engineering and Design
Serial Year :
2012
Journal title :
Fusion Engineering and Design
Record number :
2360487
Link To Document :
بازگشت