Title of article :
High-resolution evaluation of recent bank accretion rate of the managed Rhone: A case study by multi-proxy approach
Author/Authors :
Provansal، نويسنده , , M. and Villiet، نويسنده , , J. and Eyrolle، نويسنده , , F. and Raccasi، نويسنده , , G. and Gurriaran، نويسنده , , R. and Antonelli، نويسنده , , C.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Abstract :
We determined the sedimentation rates near a managed embankment on the Lower Rhone for the second half of the twentieth century. This was carried out using a combination of chronological indicators (137Cs, 241Am, dendrochronology and archived data) and sedimentological measurements. A high-resolution chronological sequence has emerged from these data sets. The average annual sedimentation rate of 14 cm has increased progressively over the last 50 years, and at a much faster rate than observed elsewhere on this river. This is probably due to a combination of factors such as the size of the river, abundance and coarse texture of the solid load, and local impact of river engineering works. We also studied hydrological and sedimentological characteristics for a number of flood events.
Keywords :
River Rhone , Bank accretion , Multi-proxy record , Managed river
Journal title :
Geomorphology
Journal title :
Geomorphology