Title of article :
Status of ITER neutral beam cell remote handling system
Author/Authors :
Sykes، نويسنده , , N. and Belcher، نويسنده , , C. and Choi، نويسنده , , C.-H. and Crofts، نويسنده , , O. and Crowe، نويسنده , , R. and Damiani، نويسنده , , C. and Delavalle، نويسنده , , S. and Meredith، نويسنده , , L. and Mindham، نويسنده , , T. and Raimbach، نويسنده , , J. and Tesini، نويسنده , , A. and Van Uffelen، نويسنده , , M.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Pages :
5
From page :
2043
To page :
2047
Abstract :
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. manual maintenance work is envisaged within the cell, when containment is breached, or the radiological protection is removed the maintenance must be conducted remotely. aintenance constitutes the removal and replacement of line replaceable units, and their transport to and from a cask docked to the cell. A design of the remote handling system has been prepared to concept level which this paper describes including the development of a beam line transporter, beam source remote handling equipment, upper port remote handling equipment and equipment for the maintenance of the neutral shield. This equipment has been developed complete the planned maintenance tasks for the components of the neutral beam cell and to have inherent flexibility to enable as yet unforeseen tasks and recovery operations to be performed.
Keywords :
Neutral beam , Manipulator transporter , remote handling
Journal title :
Fusion Engineering and Design
Serial Year :
2013
Journal title :
Fusion Engineering and Design
Record number :
2361773
Link To Document :
بازگشت