Title of article :
Divertor cassette locking system remote handling trials with WHMAN at DTP2
Author/Authors :
Marja and Lyytikنinen، نويسنده , , Ville and Kinnunen، نويسنده , , Pasi and Koivumنki، نويسنده , , Janne and Mattila، نويسنده , , Jouni and Siuko، نويسنده , , Mikko and Esqué، نويسنده , , Salvador and Palmer، نويسنده , , Jim، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Abstract :
A key ITER maintenance activity is the exchange of the divertor cassettes. The current major step in this programme involves the full scale physical test facility, namely divertor test platform 2 (DTP2), in Tampere, Finland. The objective of the DTP2 is the design and proof of concept studies of various remote handling (RH) device prototypes and their RH control systems, but is also important to define principles for standardizing control systems and methods around the ITER maintenance equipment.
velopment process of divertor cassette locking system (CLS) RH Tool prototypes is presented in this paper. The validation of the developed CLS Tool prototypes is accomplished in RH trials at DTP2. For this RH Trial, a CLS task description (TD) and tool prototypes were developed, manufactured and, finally, tested under remote operations. These tools, designed to be operated by water hydraulic manipulator (WHMAN), are water hydraulic jack (WHJ), pin tool (PT) and wrench tool (WT).
Keywords :
MAINTENANCE , Development , ITER , remote handling , DTP2
Journal title :
Fusion Engineering and Design
Journal title :
Fusion Engineering and Design