Title of article :
Production management and quality assurance for the fabrication of the In-Vessel Components of the stellarator Wendelstein 7-X
Author/Authors :
Li، نويسنده , , C. and Boscary، نويسنده , , J. and Dekorsy، نويسنده , , N. and Junghanns، نويسنده , , P. and Mendelevitch، نويسنده , , B. and Peacock، نويسنده , , A. and Pirsch، نويسنده , , H. and Sellmeier، نويسنده , , O. and Springer، نويسنده , , J. and Stadler، نويسنده , , R. and Streibl، نويسنده , , B.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2014
Pages :
4
From page :
981
To page :
984
Abstract :
The In-Vessel Components (IVC) of the stellarator Wendelstein 7-X consist of the divertor components and the first wall (FW) with their internal water cooling supply and a set of diagnostics. Due to the significant amount of different components, including many variants, a tool called Production Managing System (PMS) has been developed to organize the fabrication and the associated quality assurance. The PMS works by building a database containing the basic parts and assembly data, manufacturing and quality control plans, and available machine capacity. The creation of this database is based mainly on the parts lists, the manufacturing drawings, and details of the working flow organization. As a consequence of the learning process and technical adjustments during the design and manufacturing phase, the database needed to be permanently updated. Therefore an interface tool to optimize the data preparation has been developed. PMS has been demonstrated to be an efficient tool to support the IVC production activities providing reliable planning estimates, easily adaptable to problems encountered during the fabrication and provided a basis for the integration of quality assurance requirements.
Keywords :
W7-X , In-vessel components , quality assurance , Manufacturing organization