Title of article :
Operating experience of the experimental industrial plant for reprocessing of tritiated water wastes
Author/Authors :
Alekseev، نويسنده , , I.A. and Bondarenko، نويسنده , , S.D. and Fedorchenko، نويسنده , , O.A and Grushko، نويسنده , , A.I and Karpov، نويسنده , , S.P. and Konoplev، نويسنده , , K.A and Trenin، نويسنده , , V.D and Arkhipov، نويسنده , , E.A and Vasyanina، نويسنده , , T.V and Voronina، نويسنده , , T.V and Uborsky، نويسنده , , V.V، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
5
From page :
439
To page :
443
Abstract :
The results of 5-year operation of the experimental industrial plant for hydrogen isotope separation using combined electrolysis and catalytic exchange (CECE) process are presented. The plant is used for large-scale studies of CECE process and for reprocessing tritiated heavy water wastes. The main parts of the plant are a 100-mm diameter exchange column of 6.9 m overall height, alkaline electrolytic cells and catalytic burners. The separation performance of the column was determined. The computer code makes it possible to carry out the calculation over a wide range of conditions and to forecast a concentration profile within the column when the values of flow rates are changed. The experience gained during the plant operation shows a high efficiency of isotope separation by CECE process and allows regarding CECE process as a considerable promise for the industrial use, in particular, for water purification from tritium.
Keywords :
Tritiated water wastes , Combined electrolysis and catalytic exchange , Hydrogen isotope separation
Journal title :
Fusion Engineering and Design
Serial Year :
2001
Journal title :
Fusion Engineering and Design
Record number :
2367284
Link To Document :
بازگشت