Title of article :
Energy, material and land requirement of a fusion plant
Author/Authors :
Schleisner، نويسنده , , L and Hamacher، نويسنده , , T and Cabal، نويسنده , , H and Hallberg، نويسنده , , B and Lechَn، نويسنده , , Y and Korhonen، نويسنده , , R and Sلez، نويسنده , , R.M، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2001
Pages :
5
From page :
1081
To page :
1085
Abstract :
The energy and material necessary to construct a power plant and the land covered by the plant are indicators for the ‘consumption’ of environment by a certain technology. Based on current knowledge, estimations show that the material necessary to construct a fusion plant will exceed the material requirement of a fission plant by a factor of two. The material requirement for a fusion plant is roughly 2000 t/MW and little less than 1000 t/MW for a fission plant. The land requirement for a fusion plant is roughly 300 m2/MW and the land requirement for a fission plant is a little less than 200 m2/MW. The energy pay back time, defined later in Section 6, is little more than half a year for a fusion plant with capacity 1 GWe. Only the electrical energy is accounted for as released energy not the thermal energy. In all these indicators, fusion compares well with conventional technologies while it consumes less ‘environment’ for the construction than renewable technologies, especially wind and solar.
Keywords :
Consumption , LAND , Energy
Journal title :
Fusion Engineering and Design
Serial Year :
2001
Journal title :
Fusion Engineering and Design