Title of article :
Thermal–mechanical test on ITER primary first wall mock-ups
Author/Authors :
DellʹOrco، نويسنده , , G and Lorenzetto، نويسنده , , P and Malavasi، نويسنده , , A and Polazzi، نويسنده , , G and Simoncini، نويسنده , , M and Venturi، نويسنده , , G and Zito، نويسنده , , D، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2002
Pages :
6
From page :
117
To page :
122
Abstract :
In 1998, in the frame of the ITER EDA phase, an European R&D Programme for the Blanket Design was implemented for developing and selecting the materials and the relevant fabrication procedures for manufacturing the shielding modules of the ITER Primary Wall. The fabrication of several Beryllium armored small scale mock-ups, reproducing representative portions of a Primary Wall panels, was also launched (Fusion Technol. (1998) 195). Further experimental activities were also programmed for investigating the thermal–mechanical behavior of these mock-ups at high heat flux and under thermal fatigue tests. In 2001, the ITER European Home Team decided to assign to ENEA a contract for the thermal fatigue testing of six mock-ups aiming at verifying the reliability of the Beryllium/Dispersion Strengthened Copper alloy/Stainless Steel and Beryllium/Precipitation hardened Copper alloy/Stainless Steel joints manufactured by solid Hot Isostatic Pressing (HIP) procedure (Technical Specification for the Thermal Fatigue Tests of Be protected EDA Mock-ups). The paper presents the results of the FEM thermal–mechanical analyses performed by ANSYS code and the progress of the first test campaign.
Journal title :
Fusion Engineering and Design
Serial Year :
2002
Journal title :
Fusion Engineering and Design
Record number :
2367842
Link To Document :
بازگشت