Title of article :
An integrated architecture for the ITER RH control system
Author/Authors :
Hamilton، نويسنده , , David Thomas and Tesini، نويسنده , , Alessandro، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2012
Pages :
5
From page :
1611
To page :
1615
Abstract :
The ITER remote handling (RH) system has been divided into 7 major equipment system procurements that deliver complete systems (operator interfaces, equipment controllers, and equipment) according to task oriented functional specifications. Each equipment system itself is an assembly of transporters, power manipulators, telemanipulators, vehicular systems, cameras, and tooling with a need for controllers and operator interfaces. n operational perspective, the ITER RH systems are bound together by common control rooms, operations team, and maintenance team; and will need to achieve, to a varying degree, synchronization of operations, co-operation on tasks, hand-over of components, and sharing of data and resources. The separately procured RH systems must, therefore, be integrated to form a unified RH system for operation from the RH control rooms. system will contain a heterogeneous mix of specially developed RH systems and off-the-shelf RH equipment and parts. The ITER Organization approach is to define a control system architecture that supports interoperable heterogeneous modules, and to specify a standard set of modules for each system to implement within this architecture. Compatibility with standard parts for selected modules is required to limit the complexity for operations and maintenance. A key requirement for integrating the control system modules is interoperability, and no module should have dependencies on the implementation details of other modules. system is one of the ITER Plant systems that are integrated and coordinated through the hierarchical structure of the ITER CODAC system. It is distinguished from other Plant systems by the man-in-the-loop nature of RH operations and the need for control rooms at a level below the main control room. The RH control system architecture has been designed to also support the central monitoring and coordination of the RH activities.
Keywords :
ITER , remote , MAINTENANCE , Architecture , STANDARDS , Control
Journal title :
Fusion Engineering and Design
Serial Year :
2012
Journal title :
Fusion Engineering and Design
Record number :
2370227
Link To Document :
بازگشت