Chen، نويسنده , , Zhaoxi and Song، نويسنده , , Yuntao and Petit، نويسنده , , Patrick and Xi، نويسنده , , Weibin and Chen، نويسنده , , Yonghua and Cheng، نويسنده , , Yong and Lu، نويسنده , , Kun and Zhao، نويسنده , , Wenlong and Yi، نويسنده , , Delu and Zhang، نويسنده , , Qingquan and Shen، نويسنده , , Junsong and Zheng، نويسنده , , Jinxing and Lei، نويسنده , , Mingzhun and Liu، نويسنده , , Chen، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Pages :
5
From page :
408
To page :
412
Abstract :
The PF4 in-pit feeder includes the In-Cryostat-Feeder (ICF) and Cryostat-Feed-Through (CFT), with busbars being their key components. The relative positions of the busbar terminal joints are measured by using a laser tracker and adjusted by positioning tools. The busbars are not fixed on the separate plate until the position errors meet the manufacture tolerances. The CFT has a 2.38° penetration angle relative to the ground and will be installed firstly. The position of the connection interface between the CFT and its lifting tool is analyzed, and to reduce the total deformation and keep the assembly precision of the joints the straight part of the CFT needs to be supported. The ICF has the most critical assembly operation space, as it must be installed on its temporary support in a temporary position. After the PF4 coil has been installed the ICF will be moved to its final position. To guarantee the 30 mm safety assembly clearance provided by ITER, the collision analysis of the ICF is performed, which demonstrates that the assembly procedures are feasible.
Keywords :
PF4 in-pit feeder , analysis , production , Assembly