Title of article
Predicting labor costs in construction projects using agent-based modeling and simulation
Author/Authors
Dabirian، Shahin نويسنده Iran University of Science and Technology, , , KHANZADI، MOSTAFA نويسنده , , Moussazadeh، Mehdi نويسنده Islamic Azad University ,
Issue Information
دوماهنامه با شماره پیاپی 0 سال 2016
Pages
11
From page
91
To page
101
Abstract
In most construction projects, human resources account for 30 to 50 percent of
all project costs, thus it is an important cost element in construction projects. However, the
complexities and uncertainty of work
ow have made it dicult to predict human resource
costs. The most eective and economic management approach is computer simulation
which has a better ability to understand and identify the dynamics and statics of a case
research system. One of the steps of simulation is modeling, and choosing the best modeling
approach for prediction is very important. Agent-based modeling, which is referred to by
some as \a third way of doing science", was chosen to predict labor cost impacted by many
factors in the work
ow. In our research, the increased labor cost, based on factors aecting
work
ow, is 16 percent on average, which is predicted more accurately by the simulated
model than by planned cost.
Journal title
Scientia Iranica(Transactions A: Civil Engineering)
Serial Year
2016
Journal title
Scientia Iranica(Transactions A: Civil Engineering)
Record number
2386736
Link To Document