Title of article :
ASSEMBLY PERFORMANCE OF A GASKETED BOLTED FLANGED PIPEJOINT USING DIFFERENT BOLT TIGHTENING STRATEGIES
Author/Authors :
ABID، M نويسنده , , ABDUL WAJID، H نويسنده , , ABBAS، A نويسنده , , MEHMOOD، Y نويسنده ,
Issue Information :
دوفصلنامه با شماره پیاپی M1 سال 2015
Abstract :
This paper presents the results of the assembly process of a gasketed bolted flanged
pipe joint for two different bolt tightening strategies, i.e. ASME and Industrial using torque control
of preload method. The final clamping force is achieved in four and five passes in ASME and
Industrial strategy respectively. Axial bolt stress variation, at the end of each pass, individual bolt
bending behavior, gasket stress and flange stress variations for both strategies are discussed.
Keywords :
Pipe flange joint , Finite Element Analysis , assembly process , Clamping force , torque control
Journal title :
Iranian Journal of Science and Technology Transactions of Mechanical Engineering
Journal title :
Iranian Journal of Science and Technology Transactions of Mechanical Engineering