Title of article :
A hybrid genetic algorithm to maximize net present value of project cash project scheduling problem with fuzzy parameters
Author/Authors :
Fathallahi، F نويسنده , , Naja، A.A نويسنده ,
Issue Information :
دوفصلنامه با شماره پیاپی سال 2016
Pages :
11
From page :
1893
To page :
1903
Abstract :
Abstract. This paper studies a speci c resource-constrained project scheduling problem under uncertainty. To do so, the problem is investigated in fuzzy environment and the goal is to maximize the net present value of the project cash ows. The problem is rst mathematically formulated. Then, a hybrid Genetic Algorithm is proposed and tuned to solve this NP-hard problem. The performance of the proposed algorithm is evaluated with comparing two well-known metaheuristic algorithms through a set of instances. Finally, comprehensive computational results are illustrated and the results are analyzed and discussed.
Keywords :
net present value , uncertainty , Genetic algorithms , Discounted cash , Fuzzy sets
Journal title :
Scientia Iranica(Transactions E: Industrial Engineering)
Serial Year :
2016
Journal title :
Scientia Iranica(Transactions E: Industrial Engineering)
Record number :
2403989
Link To Document :
بازگشت