Author/Authors :
Asghari Mohammad نويسنده Department of industrial engineering - Ferdowsi University of Mashhad, Mashhad , Nezhadali Samaneh نويسنده Department of management - Iran Chamber of Commerce, Industries and Mines, Mashhad
Abstract :
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager
encounters; this is why in recent decades extensive researches have been done on scheduling issues. A type of scheduling problems is justin-
time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for appraising a
multi-objective programing that minimize total weighted tardiness, earliness and total flow time with fuzzy parameters on parallel
machines, simultaneously with respect to the impact of machine deterioration. Besides, in this paper, attempts are made to present a
defuzzification approach and a heuristic method based genetic algorithm (GA) to solve the proposed model. Finally, several dominance
properties of optimal solutions are demonstrated in comparison with the results of a state-of-the-art commercial solver and the simulated
annealing method that is followed by illustrating some instances for indicating validity and efficiency of the method.