Title of article :
Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems
Author/Authors :
Salimi, Mostafa Department of Industrial Engineering - Qazvin Branch - Islamic Azad University, Qazvin, Iran , Najafi, Amir Abbas Department of Industrial Engineering - K.N. Toosi University of Technology, Tehran, Iran
Abstract :
In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first
objective function is to minimize the completion time of project (makespan); the second objective function is to minimize the cost of
using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities is
allowed at any integer time units, and for each activity, the best execution mode is selected according to the duration and resource. Since
this bi-objective problem is the extension of the resource-constrained project scheduling problem (RCPSP), it is NP-hard problem, and
therefore, heuristic and metaheuristic methods are required to solve it. In this study, Non-dominated Sorting Genetic AlgorithmII (NSGAII)
and Non-dominated Ranking Genetic Algorithm (NRGA) are used based on results of Pareto solution set.We also present a heuristic
method for two approaches of serial schedule generation scheme (S-SGS) and parallel schedule generation scheme (P-SGS) in the
developed algorithm in order to optimize the scheduling of the activities. The input parameters of the algorithm are tuned with Response
Surface Methodology (RSM). Finally, the algorithms are implemented on some numerical test problems, and their effectiveness is
evaluated.
Keywords :
Resource investment problem (RIP) , Preemption , Serial and parallel schedule generation scheme (SGS) , NSGA-II , NRGA , Response surface methodology (RSM)
Journal title :
Astroparticle Physics