Title of article
Decreasing the Crane Working Time in Retrieving the Containers from a Bay
Author/Authors
azari, e. tarbiat modares university - tehran , eskandari, h. tarbiat modares university - tehran , nourmohammadi, a. tarbiat modares university - tehran
Pages
10
From page
309
To page
318
Abstract
Given the initial layout of a container terminal with a bay, the container retrieval problem aims at obtaining a movement sequence for the crane to retrieve all the containers arranged in a pre-defined order. In this study, we develop a computationally efficient heuristic, called constant summation (CSUM), to minimize the total crane's working time required to retrieve all the containers from a given bay. Numerical results show that CSUM is very promising in dealing with the container retrieval problems and outperforms the best known approaches recently presented in the literature in terms of the crane's working time.
Keywords
Container terminal , Container retrieval problem , Heuristic , Branch and Bound
Journal title
Astroparticle Physics
Serial Year
2017
Record number
2439041
Link To Document