    Simulation of tunnel boring machine utilization: A case study

  • Author/Authors

    Moosazadeh ، S. - Sahand University of Technology , Aghababaie ، H. - Sahand University of Technology , Hoseinie ، H. - Isfahan University of Technology , Ghodrati ، B. - Luleå University of Technology

  • Pages
    8
  • From page
    53
  • To page
    60
  • Abstract
    Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simulation approach. For this purpose, the unit operation during one working shift such as boring time, ring building time, and locomotive travel time was recorded and saved in data base. In addition, the general down times such as TBM and backup system maintenance, surface and tunnel logistic maintenance, cutting tools’ replacement, and locomotive delay times were recorded and considered in simulation. The results of this work show that the mean simulated project duration time of case study TBM is approximately 859 shifts and close to the real data with a difference of 0.92%. Finally, the average estimated utilization factor was found to be approximately 14%.
  • Keywords
    Tunnel Boring Machine , Utilization , Simulation , down time
  • Journal title
    Journal of Mining and Environment
  • Serial Year
    2018
  • Journal title
    Journal of Mining and Environment
  • Record number

    2451256